Concrete failing beneath the surface.

Exterior Slabs don't fail at the surface—They fail from the ground up. Long before anyone sees a broom finish, the future of that slab is decided by what’s beneath it: the soil (subgrade), the base course, and how well water is managed. At GSA Slabs, we treat subgrade and base as a system. Get those right, and your parking lots, aprons, and drives stay flat, tight, and serviceable for years.


Start with the Dirt: Understanding Subgrade


Every site brings its own soil behavior:


  • Sands drain fast but can ravel if under-compacted.

  • Silts take water like a sponge.

  • Expansive clays shrink and swell with moisture swings, telegraphing movement into the slab.


We begin with a practical soils read—reviewing geotech data when available and confirming it in the field. Then we proof-roll with a loaded truck to find soft spots, pumping areas, or hidden organics. If wheels dance or the surface ripples, we undercut and rebuild.


Moisture control is as important as compaction. A well-graded soil at the wrong moisture will still compact poorly. We condition the subgrade to optimum moisture, then compact to spec—typically ≥95% of Standard Proctor—and verify with density testing. In active clay zones, lime or cement treatment can lock in strength and reduce seasonal movement.


Water Is the Real Load


Concrete is strong; water is relentless. If surface and subsurface water linger under a slab, you’ll see:


  • Pumping fines at joints

  • Edge breaks

  • Frost heave

  • Settlement


We design for positive drainage—targeting 1–2% slope away from buildings—and, where needed, add underdrains or edge drains to intercept groundwater. A capillary break (clean, open-graded aggregate) directly beneath the slab prevents upward moisture migration that softens fine-grained subgrades.


The Base Course: Where Load Spreads and Durability Begins


Think of the base course as the slab’s shock absorber and load spreader.


  • We typically place 6–12 inches of well-graded aggregate (e.g., ¾″ minus with fines) over the prepared subgrade.

  • Well-graded means the particles lock together tightly, compacting into a dense matrix that resists rutting and shear.

  • Where soils are weak or wet, we add a geotextile separator between subgrade and base to keep fines from migrating upward (no more “mushy” base after a storm).


Compaction is non-negotiable. We place in thin lifts, moisture-condition, and compact to the specified density, checking with a nuclear gauge or plate tests. The result: a uniform platform with a consistent modulus of subgrade reaction (k-value)—exactly what a concrete slab needs to carry wheel loads without differential movement.


Details That Prevent Cracks and Callbacks


Slab thickness and reinforcement matter, but they can’t save a slab from a bad base.


  • We set consistent base thickness to the design grade, not just an average.

  • Transitions at trench patches and utility crossings get extra attention so the slab doesn’t hinge at weak seams.

  • For slabs that must act together—like dock aprons or drive lanes—we drill and epoxy dowels to transfer load across joints, but only after confirming the base support is uniform.


Joint layout is finalized before the pour—spacing in the range of 24–36 times slab thickness (in inches)—so that even a perfectly compacted base isn’t asked to mask random cracking caused by poor jointing.


Cold Climates, Hot Truths


Freeze–thaw and de-icing salts punish exterior concrete, but they hit subgrades even harder.


  • In frost-susceptible soils, we increase non-frost-susceptible base thickness.

  • Drainage and sealed joints keep water out.

  • Air-entrained concrete protects the slab; drainage protects the base.


Construction Discipline: How GSA Slabs Builds It Right


Our sequence is simple but strict:


  1. Identify weak soils

  2. Control moisture

  3. Compact in lifts

  4. Separate fines when needed

  5. Shape the base to final grade and slope

  6. Place concrete


We don’t let a great finish hide a bad foundation. Field supervisors carry moisture meters, compaction targets, and a cut/fill plan. If a proof-roll fails, we fix it immediately—because the slab won’t bridge the problem.


The Payoff You Can Measure


When the subgrade and base are right, slabs don’t pump at joints, edges stay tight, forklift wheels glide instead of thumping, and maintenance actually works because water isn’t trapped below.


Owners see longer life, fewer patches, and less downtime.


Plan Your Exterior Concrete with GSA Slabs


Bring us in early. GSA Slabs will evaluate your soils, drainage, and base strategy, then deliver a slab that stays true—from the first compaction pass to the last broom stroke.